手机APP下载

您现在的位置: 首页 > 在线广播 > CRI News > 2019年上半年CRI news > 正文

CRI News Report:中国在尼日利亚建造的铁路迎来安全运营1000天

来源:可可英语 编辑:aimee   可可英语APP下载 |  可可官方微信:ikekenet
  


手机扫描二维码查看全部内容

The Abuja-Kaduna railway is the first line of the railway modernization project in Nigeria.
It was financed by the Chinese government with concessional loans, and constructed by the China Civil Engineering Construction Corporation, which also provides technical services in operation.
Opened in July, 2016, the 186 kilometer rail line realized the train connection between the Nigerian capital Abuja with Kaduna, an important industrial city on the north of the country.
Last week, the Nigerian transport ministry awarded China Civil Engineering Nigeria a special medal for operating Abuja-Kaduna railway safely in the past 1000 days.
Adeola Adeokun is the general manager of Nigeria Railway Corperation.
"Today we are marking the 1000th day. We have not had any serious accidents. That does not mean we have not had incidents. We have had incidents of maybe cows or somebody lyng down on the tracks. We have not really had derailments, and because we carry a lot of people we pray that would never happen in our lifetime. So thank you for your good work in making the Abuja rails."
Faced with relatively weak railway services in Nigeria, China Civil Engineering decided to do more than just building the railway when they started the project.
The Chinese company provided the Nigeria Railway Corperation with the technical support and organized training sessions to help operate the rail system effectively.

尼日利亚阿卡铁路安全运营1000天.jpg
Manager Jiang Yigao said the Abuja-Kaduna railway has won wide compliments from Nigerian people.
"It is a significant achievement under the Belt and Road initiative between China and Nigeria. In the near future, more and more modern railways will be built. More and more Nigerians will enjoy the safe, comfortable and convenient service by the railway."
Since its opening, the Abuja-Kaduna railway has greatly alleviated the traffic congestion between the capital district and the states of Niger and Kaduna.
It has become the most preferred mode of transport by people traveling between these places.
The train tickets are often sold out. Sometimes even the train aisle is crowded with passengers.
Yusuf Mohammed is a local businessman. For more than two years, he has traveled between Abuja and Kaduna by train.
"The country would change the way we transport ourselves and goods. We need this. We need coaches. We need more locomotives. We need more rail tracks. We need to have more frequency. We need to have discrimination to every state capital. We do need that and I hope the Chinese company will support."
Now, China Civil Engineering is laying tracks for the second line of the Nigeria railway modernization project, the Lagos-Ibadan railway.
When finished, it's expected to bring great convenience to the transportation system in southwest Nigeria.
For CRI, this is Yang Guang.

重点单词   查看全部解释    
discrimination [di.skrimi'neiʃən]

想一想再看

n. 歧视,辨别力,识别

 
corporation [.kɔ:pə'reiʃən]

想一想再看

n. 公司,法人,集团

联想记忆
medal ['medl]

想一想再看

n. 奖章,勋章,纪念章
vi. 获得奖章

联想记忆
construction [kən'strʌkʃən]

想一想再看

n. 建设,建造,结构,构造,建筑物

联想记忆
constructed

想一想再看

vt. 构造,建造;创立,构筑;搭建(construct

 
tracks

想一想再看

n. 轨道(track的复数);磁道;轮胎

 
transport [træns'pɔ:t]

想一想再看

n. 运输、运输工具;(常用复数)强烈的情绪(狂喜或狂怒

联想记忆
aisle [ail]

想一想再看

n. (席位间的)通道,侧廊

 
organized ['ɔ:gənaiz]

想一想再看

v. 组织

 
initiative [i'niʃətiv]

想一想再看

adj. 创始的,初步的,自发的
n. 第一步

联想记忆


关键字: 讲解 CRI 尼日利亚 铁路

发布评论我来说2句

    最新文章

    可可英语官方微信(微信号:ikekenet)

    每天向大家推送短小精悍的英语学习资料.

    添加方式1.扫描上方可可官方微信二维码。
    添加方式2.搜索微信号ikekenet添加即可。